Capital Costs (in million Taka)
The capital cost of the project is estimated to be about Taka 2556.88 million, equivalent to US$ 36.97 million with a tentative breakup as follows:
Sl.No. Items/Description Estimated cost (in million)
Taka US$
01. Land and land development 122.14 1.88
02. Civil construction including architectural design 1268.06 18.39
03. Equipment 822.52 12.65
04. Furniture & Transport 74.70 1.15
05. Other Components including Detection Centre 109.46 1.68
06. Tax & Miscellaneous 79.00 1.22
Grand Total: 2556.88 36.97